    regard
    before you begin with the work,
 you should absolutely,
which most important safety rules consider

 The CEE - three-phase plug / couplings have the following contacts:
 
 
                
 
 
 Open the plug / clutch and terminals you as follows Him!
 
 
 Terminal name:
 
 
● protective earth (PE)
● neutral (N)
● three-phase (L1, L2, L3)
 
Yellow-green, to the terminal with the grounding or sign with the label "PE".
Blue to the terminal with the label "N"
Black, brown, black and once more, to the terminals with the labels "L1, L2 and L3"
 
Used are CEE plug in the speeches 16 A, 32 A, with the five-pin plugs are CEE devices, the three-phase. Some units should be on the spinner eighth (  for engines or pumps .....) so that objection free work! This rotation can, but only with a suitable measuring instrument check. If there is no need to present the device at the launch control whether it is True! (for example engines is the right direction of rotation with an arrow on the housing marked).
 
 In the event that the device is false, you should use it again mark off, Open and the terminals L1 and L2 exchange among themselves. After checking the device again! If objection then run free.
 
 
 CEE plug:   The pen is thicker PE (earthed). This is followed usually counterclockwise L1, L2, L3, N (Neutral).
 CEE-coupling:    The hole is thicker PE (earthed). This is followed clockwise L1, L2, L3, N (Neutral).
 
 


Valid XHTML 1.0 Transitional
Layer-Ads - Das Werbenetzwerk von morgen
 
 
 
 
 


©2008 Rieplay.com
our partners:      engineering   electrical engineering   painting wall
Important note!

The work with power can be dangerous and should only be professionals! We give tips on just right execution. About Take no liability or the like for damages for improper execution! So if in doubt, always an electric expert advice!

Please visit our imprint